Clearing, Grading & Temporary Erosion Control
Standard Detail
Section 5
Revision Date Redmond
Standard Plan
WSDOT Standard Plan
       
Filter Fabric Fence 7/1/15 502  
Stabilized Construction Entrance 3/1/17 503  
Temporary Swale 3/1/17 504  
Storm Drain Inlet Protection 9/20/07   I-40.20-00
High Visibility Fence 8/11/09   I-10.10-01
Tree Protection Fence
3/1/18 507  

The links above include PDF pages. You may obtain the free Acrobat Reader to view and print.